PRODUCTS

GAZBETONFiX®Cement-Based Aerated Concrete Masonry Mortar

APPLICATION FIELD

Used for masonry with aerated concrete.

REQUIREMENTS

  • Offers a good performance with its high adherence characteristic. 
  • Provides convenient application thanks to its adequate application and incrustation time.

TECHNICAL VALUES

Dry Bulk Density of Hardened Mortar, kg/m³

1400 ± 200

Dry Bulk Density, g/cm³

Ort 1,2

Processing Time, min.

≥ 120

Smoothing Time, min.

10 ± 5

Compressive Strength, N/mm²

≥ 5,0 (M 5)

Greatest grain size of the aggregate, mm

≤ 2

Capillary Water Absorption, kg/m².min0.5

≤ 2,5

Water Vapour Permeability Coefficient (µ)

5/20

Reaction to Fire

A1

 

APPLICATION

  • GAZBETONFIX® shall be mixed by hand or preferably with power mixer (8-8.5 l water/25 kg bag). 
  • While preparing the mortar:
    • Water shall be put to the plastic vessel first, then GAZBETONFIX® shall be added and mixed.
    • Stop for 5 minutes, and stir again to achieve a homogeneous mixture.
  • The mortar prepared shall be applied to the vertical and horizontal surfaces with a comb.
  • Ensure that joint thickness is at least 3 mm.
  • Aerated concrete block placed shall be seated by hammering from the top and side.

CONSUMPTION

2-3 kg/m²

(This is the consumption when mortar is applied with a thickness of 3 mm to a surface of 1 m²)

Consumption that shall be determined as per the wall area shall be calculated considering the brick dimensions.

PACKAGING

25 kg Paper Bag,

(delivered in pallets or as sling-bags upon request.)

STORING

1 Year Shelf Life*

* If stored in its original package without opening the package under dry, frost free conditions

 

(1 week after opening the package.)

CERTIFICATE OF CONFORMITY

TS EN 998-2 / January 2017
T Type (Designed Ready-Mixed Fine Layer Mortar)
Ministry of Public Works Pos. No: 04.478

RECOMMENDATION

  • First line shall be put in level with cemented mortar.
  • No other materials (lime, cement, gypsum, etc.) shall be added to the prepared mortar.
  • We recommend that the application shall be performed between +5°C and +35°C. Curing period may be longer or shorter at other weather conditions.
  • Do not go beyond the application field and the rules.
  • Do not inhale it directly as it is a cement-based material. Wash your eyes with plenty of water in case of contact with eyes, seek medical attention if required.
  • For detailed information, please request the safety data sheet.
  • Contact us for your technical questions and for your questions about all other application conditions.