APPLICATION
SURFACE PREPARATION
The application surface must be free from formwork oil, dust, paint and similar substances. Loose or unstable parts with poor adhesion must be removed from the surface. Precautions should be taken against dusting on plastered surfaces. On absorbent surfaces, application may begin after the surface has been dampened.
PREPARATION of the MORTAR
Pour the appropriate amount of water (8,5 L water/25 kg bag) into the mixing container. Add the powder and mix with a low-speed hand mixer. Allow the mortar to rest for 5 minutes, then mix again until a homogeneous consistency is obtained. Apply the prepared mortar with a steel trowel. Application thickness is 2-3 mm. In thermal insulation systems, it can be used as a smooth final coat plaster instead of decorative plaster and is applied with a steel trowel. For thicker applications, apply in two coats after the first coat has dried sufficiently. A light sanding may be carried out to obtai n a smooth surface.
CONSUMPTION
1.2 kg/m2 for 1 mm thickness