PRODUCTS

FUGAFIX® GENİŞ SİLİKONLUSilicone enhanced, high performance cement based ready mix wide elastic joint filler

5 Different Colour Options for a Thickness of 6-15 mm

APPLICATION FIELD

Used for filling of 6-15 mm joints of ceramic and tile coating materials on horizontal and vertical floors in interior and exterior areas in dry and medium wet environments.

 

REQUIREMENTS

Applied easily.
It has a smooth appearance.
Used conveniently on interior and exterior surfaces both vertically and horizontally. Water-repellent in high rate
Resistance against water and freeze

 

TECHNICAL VALUES

Application time, hours

< 2

Water absorption, after 30 minutes, gr (EN 12808-5)

≤  2

Water absorption, after 240 minutes, gr (EN 12808-5)

≤  5

Shrinkage, mm/m (EN 12808-4)

≤  3

Flexural Strength (after 28 days), N/mm2 (EN 12808-3)

≥  2,5

Flexural Strength (after freze/thaw cycles), N/mm2 (EN 12808-3)

≥  2,5

Compressive Strength (after 28 days), N/mm2 (EN 12808-3)

≥  15

Compressive Strength (after freze/thaw cycles), N/mm2 (EN 12808-3)

≥  15

Abrasion Resistance, mm3 (EN 12808-2)

≤1000

 

APPLICATION

SURFACE PREPARATION
Scrape any dust, chipping, construction-cement waste that may be present inside the joint hole and clean with a brush before application. Joint hole shall be dampened with water before application, if required.

 

CONSUMPTION

 

Consumption Amount (g/m2)*

Ceramic Size(cm)

Joint Gap (mm)

6 mm(g/m2)

10 mm (g/m2)

15 mm (g/m2)

10*20

1000
1730
2590

15*15

920

1530

2300
15*20

800

1340

2000
20*20

690

1150

1730

20*25

1000

1650

2490

20*30

920

1530

2300

33*33

670

1110

1680

 

PACKAGING

  • It is shipped in 25 kg kraft bags, on pallets..

 

STORING

  • Storage period; It is recommended to be consumed in 6 months from the date of production if

    stored in its original package without opening the package under dry, frost free conditions and is

    stacked as maximum 8 bags, and in 1 week after opening the package.

  • Packages shall be tightly closed when it is not used.

 

CERTIFICATE OF CONFORMITY

RECOMMENDATION

  • No other materials (lime, cement, gypsum, etc.) shall be added to the prepared mortar.

  • Plaster shall not be used again by mixing with water or dry plaster if its application time has

    expired.

  • You shall wait at least 24 hours for joint application after fixing operation.

  • We recommend that the application shall be performed between +5°C and +35°C.

  • It shall not be applied on frozen surfaces.

  • Do not apply under direct sunlight.

  • PRIMEL 300® shall be used for cleaning of the contaminated joints.

  • To prevent damage to the coloured joint fillings, do not use strong chemical cleaning agents

    such as lime remover, hydrochloric acid, etc.

  • Do not go beyond the application field and the rules.

  • Do not inhale it directly. Wash your eyes with plenty of water in case of contact with eyes, seek

    medical attention if required.

  • For detailed information, please request the security data sheet.

  • Contact us for your technical questions and for your questions about all other application

    conditions.