APPLICATION
Add powder component B to liquid component A and mix with a mixer operating at 400–600 rpm until a homogeneous mixture is obtained (approximately 5 minutes). Use the mixture without prolonged delay and consume it within 1–2 hours. Apply the prepared material to the primed substrate. Determine the total application thickness according to the application area and the water pressure to which the waterproofing layer will be exposed. Consumption and the number of coats may vary depending on the substrate and water pressure. Apply the second coat only after the first coat has dried completely. Apply a scratch coat to highly porous, uneven or pitted surfaces to prevent air bubbles and/or level the surface. Working and drying times may increase or decrease depending on temperature. Waterproofing reinforcement mesh may also be used if required. If SUTOP® EBT-2B PLUS A is to be covered with a protective layer, broadcast silica sand onto the final coat before the surface dries. Once dry, sweep away loose sand. A screed may then be laid over the cleaned surface. After this protection has been provided, ceramic tiles may be installed using tile adhesive. Never apply in rainy weather or on wet substrates. For wall applications, install thermal insulation or protection boards and drainage membranes before backfilling.
CONSUMPTION
Consumption for a 1 mm dry film thickness is 1.5 kg/m². Consumption for a minimum of 2 coats is 3–3.5 kg/m². (May vary depending on substrate characteristics and application conditions.)