APPLICATION
SURFACE PREPARATION
-
Application surface shall be solid, free of any type of oil, grease, corrosion, paraffin, paint, bitumen residues and any loose parts shall be moved away.
-
Use repair mortars on surfaces that are not smooth. Recently plastered surfaces and reinforced concrete surfaces shall be waited until the curing period of 28 days has expired. Edges and corners shall be chamfered with a diameter of 4 cm using DOLTEK®. Surface hole may be repaired with DOLFIN®.
-
The flow of water towards the drains shall be ensured; any puddles shall be avoided. Deep cracks shall be filled with a suitable polyurethane sealant.
PREPARATION of the MORTAR
-
SUTOP® ELASTOMER is a material that is ready to be used.
-
For primer application, 50% of water shall be added to the material and it shall be mixed for 3-5 minutes with a mixer with a speed of 400-600 rpm (PRIMEL 100® may be used as primer).
-
After the primer, it shall be applied in 2 coats.
-
Primer prepared shall be applied to the surface with a brush and roll (200 g/m2).
-
When the primer has dried, other coats shall be applied so that they shall create a wet film thickness of 1-1.5 mm.
-
Cracks, connection points, corners and edges shall be supported with a water insulation net or armure of 1.65 g after the application of the first coat.
NOTE: SUTOP® ELASTOMER is produced in white.
It may be coloured with paste pigment without exceeding 5% of the material amount.
It may be painted with acrylic based exterior paint after it is cured.
CONSUMPTION
For 1 mm of wet film thickness 1,36 kg/m2
For 1 mm of dry film thickness 1,48 kg/m2
For grooves and streams 2-3 kg/m2
For terraces 3-4 kg/m2