PRODUCTS

SUTOP ÇiFT® KRiSTALiZECement-Based Double Component Crystalized Water Insulation Mortar

APPLICATION FIELD

Cement based crystallized water insulation material used on cement-based plasters, screeds and exposed concrete for water insulation from negative side on retaining walls, elevator shafts, foundations and external walls of pools etc. against leaks and surface waters on horizontal and vertical surfaces in interior and exterior areas.

REQUIREMENTS

  • It may be easily and rapidly applied.
  • Resistant against water pressure from negative direction.
  • Hygienic.
  • Creates a crystalline structure on the capillary hole inside the concrete, and provides water impermeability by blocking the hole.
  • It is crystallized and creates a flexible and strong layer on the surface besides penetrating the concrete and thus provides a double layer protection.
  • Prevents unpressurised and weak water leaks by preventing the humidity permanently.
  • Protects surfaces against destructive effects of the humidity and moisture.
  • Resistant against excessive weather conditions.
  • Suitable for using on brick and plastered surfaces such as brick, pumice concrete, briquette, aerated concrete, concrete blocks, lime stone, etc.
  • Does not contain soda and chloride, protects reinforcement in the concrete against corrosion.

TECHNICAL VALUES

Water Vapour Permeability

Class I

Shear Tensile Adhesive Strength

With no traffic load / Rigid

Class of Reaction To Fire

A2

Adhesive Strength, N/mm²

≥1

Capillary Water Absorption and Water Permeability (kg/m²h0.5)

Max. 0,1

Powder Density, g/cm³

1300 ± 200

Application Time, minutes

Avg. 50

 

APPLICATION

SURFACE PREPARATION  

  • The surface of application shall be free of pores and cracks.
  • The surface shall always be free of materials such as form oil, paint, dust etc.
  • Parts on the surface (iron, wood, etc.) shall be removed and these hole shall be filled with appropriate Entegre Repair Mortars. In case of active water leaks, these shall be stopped with WATERFIX®.
  • You may advance to application after dampening the surface.

PREPARATION of the MORTAR  

  • Component B shall be put inside the mixing vessel (9 kg of fluid component).
  • Then, Component A (25 kg of powder component) shall be added completely by stirring continuously and it shall be stirred until a homogeneous mixture is obtained (approximately 3 minutes) with a low speed mixer.
  • After resting for 5 minutes, the mortar shall be stirred until achieving fluid characteristics again.
  • After dampening the application surface with water, fluid mortar shall be applied on the surface that may contact with water using a brush.
  • It shall be applied as 2 or 3 coats, and so that the direction of application is perpendicular to the previous application.
  • Wait at least for 3 hours between coats depending on the temperature, and perform dampening procedure between application of coats when required.
  • We recommend you to stir the product continuously during application.
  • Walls and surfaces to be walked on shall be coated with a final coat such as screed, ceramic, etc.
  • Surface shall be kept dampened and it shall be prevented from drying for 5 days after application.
  • It shall be protected against external factors such as direct sunlight, wind, frost, etc.

CONSUMPTION

1.5-2.0 kg/m² for single coat
 
(Application at proper surface and ambient conditions is taken as a reference.
It may differ as per surface specifications and application conditions.)

PACKAGING

Component A: 25 kg polyethylene-reinforced kraft paper bags,

Component B: 9 kg plastic drums

(delivered in pallets or as sling-bags upon request.)

STORING

6 Months Shelf Life*

* If stored in its original package without opening the package under dry, frost free conditions

 

(1 week after opening the package.

Likit bileşen 0 °C’nin altındaki sıcaklıklarda donmaktadır.)

CERTIFICATE OF CONFORMITY

Complies with TS EN 1504-2 / April 2008 standard.
It is suitable for contact with drinking water as per BS6920 standard.
(ODTU-Department of Chemical Engineering Report No: 2016.03.04,039/02 Report Date: 17/03/2016)
Ministry of Public Works Pos. No: 04,477/1

RECOMMENDATION

  • No other materials (lime, cement, gypsum, etc.) shall be added to the prepared mortar.
  • Plaster shall not be used again by mixing with water or dry plaster if its application time has expired.
  • We recommend that the application shall be performed between +5°C and +35°C.
  • SUTOP CIFT® KRISTALIZE shall be protected against effects such as sunlight, wind, rain and frost, etc. within the first 24 hours after application.
  • It shall not be applied on frozen surfaces.
  • Do not apply under direct sunlight.
  • Do not go beyond the application surface and the rules.
  • Do not inhale it directly. Wash your eyes with plenty of water in case of contact with eyes, seek medical attention if required.
  • For detailed information, please request the security data sheet.
  • Contact us for your technical questions and for your questions about all other application conditions.