APPLICATION
Surface Preparation
Before application, the surface must be dry and free from dust, oil and other contaminants. The surface temperature must be above 15°C. If possible, concrete surfaces should be washed with pressurised water. Allow at least 1 day of drying in sunny weather. Any water absorbed by the concrete surface must evaporate completely. Do not apply to wet substrates.
Application
Application by spraying onto the road surface with automatic application equipment is recommended. If necessary, it may also be applied by brush or roller. The product is supplied at application viscosity and does not require thinning. Wear gloves and a mask during application.
CONSUMPTION
|
Coating System
|
Product
|
Consumption
|
|
Primer
|
EPOFLOOR STONE CARPET UV VARNISH
|
~ 0,15–0,20 kg/m²
|
These values are theoretical and do not include any additional material required due to surface porosity, profile, variations in level or wastage.